Beschefer Project, Québec, Canada

Project Snapshot

Status:

Advanced exploration stage

Location:

28 km southwest of Fenelon Gold project

Commodity:

Gold

Ownership:

100% Wallbridge

Current exploration activities:

Exploration is carried out by the operator of the option agreement, Goldseek Resources; for details on the work completed, please refer to Goldseek’s disclosures. 
4,975 m of drilling completed in 2021
4,000 m drilling being carried out in Q1 2022

Mineral resources:

None

  • Overview

    The Beschefer project covers 6.47 km2 and is located 28 kilometres southwest of the Fenelon Gold project. High-grade gold mineralization was intersected on the B-14 Zone by prior operators (1995, and 2011-13). This large-scale mineralized structure extends for 500 metres along strike and down-dip for 600 metres, along with the presence of additional known parallel mineralized shear zones.

    Maps & Images (click to enlarge)

    Regional Overview Geology
  • Current Program

    Exploration is carried out by the operator of the option agreement: Goldseek Resources; for details on the work completed, please refer to Goldseek’s disclosures. 

    Approximately 4,975 m of drilling was completed in 2021, with the best intersection returning 4.92 g/t Au over 28.65 metres.

  • Brief History

    Historically, the Beschefer area has mainly been explored for volcanogenic massive sulfide deposits similar to the Matagami camp and the Selbaie mine. 

    Gold mineralization was discovered in the B-14 Zone in 1995 by Billiton Canada Inc. Limited exploration was carried out prior to the involvement of Excellon Resources from 2011 to 2013. They completed ~17,000 metres of drilling and intersected the highest gold grade intersections on the project, including 55.63 g/t Au over 5.57 m, 13.07 g/t Au over 8.75 m, and 10.28 g/t Au over 8.0 m.  The known mineralization on the B-14 Zone extends over a strike length of 500 metres and down-dip to ~600 metres. Additional known parallel mineralized shear zones have been identified in the drilling. To date, it has only been tested by wide-spaced drilling with holes 75 to 100 metres apart.

    In October 2018, Wallbridge entered into an option agreement (the “Agreement”) to acquire 100% of the Beschefer property from Lateegra Gold Corp. (“Lateegra”, a wholly-owned subsidiary of Excellon Resources), in which Wallbridge could earn 100% interest by paying 7.0 million Common Shares and incurring $4.5 million in exploration expenditures over a three-year period.

    Wallbridge completed its initial drill program of five drill holes for a total of 1,600 metres at the end of 2018 and assay results were announced on March 13, 2019. Mineralization typical of gold-bearing portions of the B-14 shear zone was intersected in all five holes at the expected depths demonstrating the continuity of the mineralized system within the two high-grade shoots.

    In March 2020, the Company entered into an acknowledgement, release and quitclaim agreement with Lateegra whereby Lateegra agreed to deem the exercise of the option pursuant to the Beschefer  Agreement satisfied upon the issuance of 3.0 million Common Shares and 500,000 common share purchase warrants exercisable for $1.00 per Common Share and expiring five years from the date of issuance. 

  • Geology and Mineralization

    The Beschefer project is located in a favorable orogenic setting 45 kilometres northeast of the Casa Berardi gold mine (Hecla Mining) and 28 kilometres southwest of the Fenelon Gold deposit. The geology of the property is predominantly intermediate to felsic volcanic rocks of the Harricana-Turgeon volcanic belt of the Brouillan volcanic complex. The main structure identified to date on the project is the northeast-southwest trending B-14 Zone, an intensely sheared deformation zone with strong sericite, ankerite, and hematite alteration containing quartz veining and pyrite. The known mineralization on the B-14 Zone extends over a strike length of 500 metres and down-dip (southeast) to a depth of nearly 600 metres. Additional known parallel mineralized shear zones have been identified in the drilling. 

    Beschefer Project – Drill Results Highlights for Zone B-14

    Drill Hole

    From

    (m)

    To

    (m)

    Length

    (m)

    True Width

    (m)

    Au

    g/t

    Zone

    Year

    Company

    BE13-038

    323.36

    328.93

    5.57

    5.41

    55.63

    B-14

    2013

    Excellon

    BE12-014

    220.75

    229.50

    8.75

    7.80

    13.07

    B-14

    2012

    Excellon

    including...

    228.00

    229.50

    1.50

    1.34

    58.50

     

     

     

    B14-35

    204.00

    212.00

    8.00

    7.28

    10.28

    B-14

    1997

    Les Mines Selbaie

    including...

    204.40

    205.00

    0.60

    0.55

    86.74

     

     

     

    BE11-003

    179.42

    183.20

    3.78

    3.69

    12.40

    B-14

    2011

    Excellon

    B14-6

    156.10

    184.10

    28.40

    28.22

    3.56

    B-14

    1996

    Les Mines Selbaie

    including...

    178.60

    184.10

    5.50

    5.47

    7.42

     

     

     

    BE13-042

    454.93

    463.65

    8.72

    8.00

    5.16

    B-14

    2013

    Excellon

    including...

    459.37

    459.67

    0.30

    0.28

    91.4

     

     

     

    BE18-048

    203.62

    223.63

    20.01

    19.57

    2.55

    B-14

    2018

    Wallbridge

    including...

    203.62

    213.90

    10.28

    10.05

    3.47

     

     

     

    including...

    204.86

    205.97

    1.11

    1.09

    14.33

     

     

     

    including...

    221.47

    223.63

    2.16

    2.12

    5.90

     

     

     

    BE13-043

    117.61

    120.10

    2.49

    2.30

    6.65

    Upper

    2013

    Excellon

    SBJ-06-01

    201.80

    211.80

    10.00

    9.03

    4.46

    B-14

    2006

    Seagreen

    BE12-006

    114.95

    122.75

    7.80

    6.89

    4.54

    B-14

    2012

    Excellon

    BE12-030

    362.94

    369.00

    6.06

    5.98

    3.56

    B-14

    2012

    Excellon

    B14-43

    187.30

    187.80

    0.50

    0.50

    29.71

    Upper

    1997

    Les Mines Selbaie

    B14-4

    159.90

    160.70

    0.80

    0.79

    16.94

    B-14

    1996

    Les Mines Selbaie

    BE11-001

    185.46

    194.84

    9.38

    9.24

    3.01

    B-14

    2011

    Excellon

    BE13-045

    559.20

    570.30

    11.10

    9.40

    3.03

    B-14

    2013

    Excellon

    including...

    564.30

    570.30

    6.00

    5.08

    4.25

     

     

     

    Maps & Images (click to enlarge)

    Regional Overview Geology
  • Maps & Photos
    Beschefer Cross Section
    Beshefer Long Section

Sign Up for News


Our
Governance

boardroom icon
We believe trust and transparency are essential to the way we operate.

Join Our Team

Wallbridge Mining Company Limited is an equal opportunity employer.

Job offers at Wallbridge Mining

Position Title Status Location
Mechanic 14/14 Schedule Fenelon
Environmental Technician 4 days of 10-hour work, followed by 3 days off Fenelon
See All Jobs